Harmony

Harmony

Tuesday 3 May 2016

Getting ready for the put in

We spent a day getting the last few things ready on Harmony before Tuesday's put in. Then went for a lovely walk on the hill behind Largs, where there is a neolithic chambered tomb and then great views over Largs Bay.
Hilary has finished knitting her new hat, and took it out for an airing.


Monday 2 May 2016

Following the blog

To those of you who like to follow the blog but get bored with checking back to see if I have added anything new, you can get an email notification when I add a post.
Just put in your email address in the box on the right of the blog page and then follow the instructions.
I thought we can try it and see what happens. Cheers Jon


2016 - a new adventure

Arrived on the boat yesterday, after the usual long drive up. Stopped off for a break at the NT gardens Acorn Bank - loads of fritillary in the orchard (they must practice rigorous rabbit control!)


Then on up to Largs through the rain. Harmony is stored right at the back of the yard adn looks quite smart as we drive up. I had been up a month earlier to antifoul the bottom and do some fettling.




Priming the antifoul
Looking a lot smarter

We sorted the boat and then battened down the hatches for gales and rain forecast for the night.
It was a rough night with the boat being rocked on the stand by the wind.
Rain this morning and then  breakfast round the new table. Hilary came up with the idea of an 18" diameter table in the cabin - great idea, it works really well

A day of fettling ahead in between the showers. The sun is shining and the oyster catchers a reeling about the yard shouting at each other.